    • Patriot Solar Group (PSG) has had a long standing relationship with Martifer Solar, completing over 5MW of projects to date.
    • For this Particular Project, PSG met with martifer’s engineering team at the site location during the summer of 2012. PSG assessed the site conditions to help Martifer design a ground mount array that would work with the challenging terrain and soil conditions.

    Project Objectives/

    • Design and engineer racking system to accommodate terrain up to 18°.
    • Install Post, racking, and modules under a demanding timeline for completion.

    Project Results/

    • Racking installation was completed in just over three weeks with a crew of twelve. This allowed more time for panel installation so Patriot could meet their deadline in December of 2012.
    • PSG’s installation crew overcame the diverse terrain and soil conditions by using Patriot’s patent pending telescoping and adjustable tilt post.